Shuttle Launch on Hold 'til Feb.
Changeout of the suspect connector that causes false readings and the soldering of the associated wires pushes the next lauch into Feb. Better safe than sorry
Changeout of the suspect connector that causes false readings and the soldering of the associated wires pushes the next lauch into Feb. Better safe than sorry