Space/Science — HabitableZone

Space/Science » in reply to Your numbers are bogus

The reason I said 1000MW

Is because Westinghouse's new AP1000 puts out that much. It is the big brother to their AP600 reactor. These reacrors are built on an assembly line as aposed to on site, so the cost per unit is far lower and the quality is far higher.

Log in or register to post.

The whole thread (15 posts)