When work is done on the summit you are supposed to write a daylog that is distributed to the entire organization so everyone is aware of the status of of operations.
"We drained the laser dye from the amplifier loop. We started by disabling the fire alarm on the modicon, since the ethanol in the dye could trigger the ethanol sensors, causing the fire alarm to go off, In other words, to paraphrase a quote by Julius Caesar in 49 B.C., "The dye is cast once the modicon has been crossed".
We made water in the aluminizing room.
We plan to fill the Amp Dye loop with De-ionized water with a little ethanol added to keep it from freezing. We considered placing a bunsen burner in the dye cabinet to keep the water from freezing, but upon discussion with the safety officer that idea was nixed.
The tasks were accomplished without incident, no one died or was dyed"
Off Topic » in reply to Physics Geek Joke
summary of work done on Saturday
The whole thread (29 posts)
- Physics Geek Joke
- summary of work done on Saturday
- You guys quark me up! (n/t)
- This thread way too strange for me. (n/t)
- "Certainly" ..
- lol (n/t)
- Good one.... (n/t)
- Hehe! Lets assume the blow wasn't fatal...
