Old news
Griffin has been saying for weeks that 28 flights by 2010 isn't doable. So they are figuring out which of those ISS assembly launches can be performed by other heavy lift vehicles. A new schedule based on that is due in July I believe.
The shuttle needs to be retired with all due haste. If we can get 15 more flights without another disaster we will be fortunate.
