You can start to work the numbers with Jupiter, a lunar orbit fueld station, and a landing frame
Or you can work the numbers in remin with the CZ5.
But to start you need to figure the total payload mass required on the Moon for CAPS, and the total instrument suite mass,
along with the required construction vehicles.
