Space/Science — HabitableZone

Space/Science » in reply to MER hardware works, but terrain/environment limits

Cost drives conservative mission planning

For MER, the planetary scientists complained bitterly about being excluded from interesting landing sites by the engineers and mission planners. The managers were so afraid of augering-in that good science got second best. MER went for about $400 million each and had a flight proven EDL system. MSL will probably cost about a billion dollars for a single vehicle with a dodgy EDL system. The problem concerning site selection will be much worse with MSL. With a mass produced MER approach, the managers could take an unorthodox mission tactic. The managers could tell the mission planners that at least 25% of the MERs are expected to auger-in. If there was a higher surivial rate then the mission planners would be scolded for being too conservative. If the program had a total of 12 landers, then 8 could auger-in leaving 4 landers at extremely interesting sites. So the options are;

1) At least 4 MER type landers functioning at very interesting landing sites.
--OR--
2) A billion dollar pile of scrap metal augered into an uninteresting landing site.

Seems like a real easy choice to me.

Tary

Log in or register to post.

The whole thread (18 posts)