Hi All
Finally a timetable for deployment of fusion reactors - according to a New Scientist write up the fusion effort is being "fast-tracked". In fusion-speak that means we get ITER and a materials-test-facility by 2015, then a demo reactor by 2031, and a full power-plant by 2048.
So instead of being "20 years away" it's 43 years and counting.
That's a shit-load of waiting around for the dubious prospect of 10 gigawatt power-plants and neutron-activated reactor-walls to be dumped every couple of decades. However it's roughly when we'll be needing it to keep up with energy demand. I'm hoping once they've figured out the damned things that smaller facilities will be feasible. Portable fusors on ships providing desalination as a waste-heat by-product are going to be "hot" property as ground-water dries up world-wide.
Adam
Fusion by 2048
The whole thread (15 posts)
- Fusion by 2048
- I was kindof disturbed by the disposal of 30,000 tonnes of activated reactor structure after decommissioning
- Millions of tonnes of fission waste???
- Actually hundreds of millions of tonnes of fission waste
- Waste from uranium mining is less radioactive than it was when it was in the ground. (n/t)
- Actually hundreds of millions of tonnes of *radio* waste
- Actually hundreds of millions of tonnes of fission waste
- Millions of tonnes of fission waste???
- I was kindof disturbed by the disposal of 30,000 tonnes of activated reactor structure after decommissioning
