Cost, time-to-build.
The KVLY-11 Television tower in North Dakota was built in 30 days and cost only $3.2 million (2005 dollars). My Venturi funnel wind generator would generate as much power as a nuclear reactor for a fraction of the cost.
KVLY-TV mast
